• -43%

100A-NY-D02 Precíziós kettős impulzuskódoló Ponthegesztőgép Transzformátor vezérlő Áramidő vezérlőkártya

100A-NY-D02 Precíziós kettős impulzuskódoló Ponthegesztőgép Transzformátor vezérlő Áramidő vezérlőkártya

6 460 Ft 43% megtakarítás
11 333 Ft
Nincs adó
Description. 3.2: Display status description. The controller has three operation states, welding preparation, parameter query and parameter change. Welding preparation: running lamp is always on, time, current, interval, time, current indicat
Mennyiség

 

Biztonsági feltételek

 

Szállításii feltételek

 

Visszaküldési feltételek

Description
3.2: Display status description
The controller has three operation states, welding preparation, parameter query and parameter change.
Welding preparation: running lamp is always on, time, current, interval, time, current indicator is off
Parameter inquiry: Operating indicator lights out, time, current, interval, time, current correspond to the amount of indicator lights, digital tube is always on, the value displayed is the corresponding parameter value.
Parameter change: Operating indicator lights out, time, current, interval, time, current corresponding to the amount of indicator lights, digital tube flicker, the value displayed is the corresponding parameter value change value.
3.3: welding preparation
Through the counter-clockwise rotation of the encoder, the running lights are always on, time, current, interval, time and current indicator lights are off. At this time, welding can be carried out. The value displayed by the digital tube is the current welding count value.
3.4: voltage calibration
Because this controller has the function of network voltage compensation, when it is installed for the first time, only one voltage calibration is needed. (In the future, as long as the power transformer is not replaced, no calibration is needed)
Calibration operation:
In the operation state, long press micro-motion until the time, current and interval lights are all turned on. At this time, use the multimeter to measure the city voltage, such as the voltage measured at that time is 225 V. Then, rotate the encoder, make the digital tube display value 225, then double-click the micro-switch, and exit the calibration.
3.4: parameter change
32959001249/1

Hasonló kategóriák mint 16 :

Reviews

Write your review

100A-NY-D02 Precíziós kettős impulzuskódoló Ponthegesztőgép Transzformátor vezérlő Áramidő vezérlőkártya

Description. 3.2: Display status description. The controller has three operation states, welding preparation, parameter query and parameter change. Welding preparation: running lamp is always on, time, current, interval, time, current indicat

Write your review